Early Learning Center

Location

Phoenixville, PA

Services

An Early Learning Center and Elementary School in a new 152,000 square foot two story building. It consists of K-5 classroom spaces, dining area, gymnasium and media center. The building is structural steel framed with slab on grade and concrete slab on composite steel deck.

Challenge

The project is a four prime contractor job.

  • General Construction
  • Electrical Construction
  • HVAC Construction
  • Plumbing Construction

MYCO was awarded the Plumbing Construction contract.

Solution

Underground and above ground is PVC pipe and the installation was assisted by the GPS total station system. The domestic water system was completed using Pro-Press and Sweat combined. The school will have 2lb gas for the natural gas system. It is piped using black iron welded or screwed. All fixtures have low water consumption for LEED Silver rating.

Sucessful Outcome

The success of the project will be weighed in the coming months, but, all signs point in that direction.

Rooftop Inspecting

Previous Case Study

Nitschmann Middle School

A new middle school is being built in the Bethlehem School District. The building totals 180,000 square feet, including 2 gymnasiums, a 700 seat auditorium, library, kitchen, cafeteria, music & choral rooms, science labs and classrooms.

Next Case Study

Penn State University – Susan Welch Liberal Arts Building

The Penn State University Susan Welch Liberal Arts Building located in University Park, PA is the first new liberal arts building on the school’s campus in over 50 years and is the beginning of sweeping renovation and construction across the campus.