Early Learning Center
Challenge
The project is a four prime contractor job.
- General Construction
- Electrical Construction
- HVAC Construction
- Plumbing Construction
MYCO was awarded the Plumbing Construction contract.

Solution
Underground and above ground is PVC pipe and the installation was assisted by the GPS total station system. The domestic water system was completed using Pro-Press and Sweat combined. The school will have 2lb gas for the natural gas system. It is piped using black iron welded or screwed. All fixtures have low water consumption for LEED Silver rating.


Sucessful Outcome
The success of the project will be weighed in the coming months, but, all signs point in that direction.

Previous Case Study
Nitschmann Middle School
A new middle school is being built in the Bethlehem School District. The building totals 180,000 square feet, including 2 gymnasiums, a 700 seat auditorium, library, kitchen, cafeteria, music & choral rooms, science labs and classrooms.

Next Case Study
Penn State University – Susan Welch Liberal Arts Building
The Penn State University Susan Welch Liberal Arts Building located in University Park, PA is the first new liberal arts building on the school’s campus in over 50 years and is the beginning of sweeping renovation and construction across the campus.